UK construction blog
Home > Construction > Crane crash causes delays

Crane crash causes delays

July 30th, 2013

A mobile crane crashed in to a concrete barrier on London’s M25 in the UK over the weekend closing it down for a short period. The incident occurred on the orbital highway’s anti-clockwise direction between Junction eight and nine in Surrey.


The crane a five axle Grove GMK250 is owned by Bronzeshield Crane Hire, fortunately no one was hurt in the incident.

An investigation into what happened is underway

Link To This Page
1. Click inside the codebox
2. Right-Click then Copy
3. Paste the HTML code into your webpage
powered by Linkubaitor
Comments are closed.