Two huge 16.2 metre steel trusses will be lowered into position to top off Uni’s 27.5 million building

‘Topping Off’ ceremony welcomes the High Sherriff to guide the trusses into position – at 12.30pm on Today Local firms help finish job AS an architecturally-innovative £27.5 million building at the University of Huddersfield takes shape, two giant steel trusses that will help lock the structure in place are to Continue Reading