IP Explanation and Ratings

IP Explanation and Ratings EN 60529 outlines an international classification system for the sealing effectiveness of enclosures of electrical equipment against the intrusion into the equipment of foreign bodies (i.e. tools, dust, fingers) and moisture. This classification system utilizes the letters “IP” (“Ingress Protection”) followed by two or three digits. Continue Reading

Samsung Q1 Powerbank Extended Battery

Samsung Q1 and Q1 ULTRA Powerbank Extended Battery Gives approximately an extra 9 hours survey or working time Also acts as a charger for the onboard battery and fits neatly into your pocket while surveying. Manufacture Ref: AA-PL0UC8B/E or BA96-0314A Samsung exemplifies technological determination and progressive ideals. From technology to Continue Reading

Robert Stern called in to to end competition deadlock at Oxford University

Oxford University’s expansion is stalled by style wars Robert Stern from Yale University has been parachuted into the midst of a prestigious competition for Oxford University because of  a “deadlock” over whether to chose a modern or classical architect. The original shortlist for the £30 million Institute of Public Policy Continue Reading

Sitemaster Building Software

For professional building surveys The extensive features of SiteMaster Building are especially interesting for users that need to create and deliver professional CAD drawings. The layer management supports the combination of several floor plans in one single file. Heights of rooms, openings and symbols can be recorded and exported. Lasered Continue Reading

New Olympic Stadium Construction Jobs to be created in London

Structural engineering jobs are helping the construction of London’s Olympic Stadium to progress. The latest phase which began exactly one year ago, involves the internal fit-out of hundreds of rooms at the stadium. 700 rooms are being created in the area below the venue’s podium, which includes eight changing rooms Continue Reading

Case Study 1550 Churches Surveyed for the Archdiocese of Freidberg Germany

Case Study – 1500 Premises/Churches Surveyed for the Archdiocese of Freiberg, Germany Following a long and exhaustive selection process our client CleanConsult from Denzlingen has been awarded a contract by the Archdiocese of Freiburg to carry out the building survey on 1500 of their properties by using Gräbert SiteMaster Building. Continue Reading

Sitemaster Elevations – Elevational Drawings from Photographs

SiteMaster Elevations Photographic Facade Survey SiteMaster Elevations – surveying to precise exterior views Save Time and Money – Now you can produce Elevational Drawings from Photographs Photographic Facade Survey SiteMaster Elevation is an independent add-on for SiteMaster. You can benefit from photogrammetric procedures by determining detailed measurements from freehand digital Continue Reading